|
|
Revision 1 - 31 March 2000, David Sigmon
 |
AsTEX ECR
|
These instructions are not complete and have not been tested.
Sample Preparation
The ECR is designed to handle six-inch wafers only. If you need to
process something smaller AsTEX has recommended taping the smaller
sample to a six-inch wafer with Kapton tape. Do not use other products
that will not withstand high temperatures. Do not allow your sample to
cover the outer half inch of the six-inch host wafer. This area must
be clear as the wafer clamp will come down on the wafer in this area.
Logging In
- Press the "OPERATOR" button in the upper left corner of the
screen
- Enter your login name and password, then press OK
Please remember to log off when you are finished (see Logging Off
below)
Running Process
- Press the "Run" button at the top of the screen. The system will
display the Run page
- Press "Select Recipe" at the right side of the screen.
- Select the recipe you wish to run from the list and press OK.
- Press "Run" at the right side of the screen.
- The system will ask whether to run a wafer that is already in the
chamber, run a wafer that is already in the load lock, or load a new
wafer. Usually you should select load a new wafer here.
- If you choose to load a new wafer, the system will vent the load
lock. This may take several minutes. When it is finished you will be
prompted to load your sample into the lock.
- Open the lock cover. It should open easily if the lock is
vented.
- Place your wafer on the sample transfer arm. It should fit
securely into the cutout with the wafer flat facing towards the left.
- Close the lock cover.
- tell the system that you are finished.
- You will be prompted to look into the chamber and verify that the
wafer pedestal is clear. After you have checked it press OK.
- The system will load the wafer into the chamber and run the
process automatically.
- After the process completes, the system will transfer the wafer
back to the load lock.
- The system will ask if it should vent the load lock. Choose
yes.
- After the load lock has vented, open the cover and remove your sample
- Close the cover and press "Pump Lock?" to pump the load lock back down.
The lock should always be left under vacuum when your run is complete.
|